Spain Portugal Morocco All Stadiums Change Log Method Newsletter
Live Tracker · Last checked 17 August 2026

2030 World Cup venue status

Twenty-three stadiums were included in the hosting plans approved by FIFA in December 2024. Not all of them will host a match. One host city has already withdrawn, several venues do not yet exist, and FIFA is weighing a reduction in the overall number of grounds. This page records where each venue stands, what the source is, and when we last checked.

Status labels are our reading of publicly reported information, not FIFA designations. Where reporting is contested we mark the venue as at risk rather than removing it.

Confirmed · existing ground Building or renovating Reported at risk Withdrawn
StadiumCityCountryCapacityStatusNote
Santiago BernabeuMadridSpain83,186ConfirmedRedevelopment complete. Named as a contender for the final.
Camp NouBarcelonaSpain105,000 plannedRenovatingRebuild expected fully operational in 2027. Would be Europe's largest ground.
Civitas MetropolitanoMadridSpain70,692ConfirmedHosted the 2019 Champions League final. No major works required.
San MamesBilbaoSpain53,331ConfirmedCompleted 2013. Already meets FIFA requirements.
La CartujaSevilleSpain70,000RenovatingAthletics track removal and reconfiguration planned.
Reale ArenaSan SebastianSpain42,300At riskResidents wrote to FIFA in April 2025 asking the city be dropped, citing overtourism. Also named in reporting on venue reduction.
RCDE StadiumBarcelonaSpain40,500ConfirmedOpened 2009. Second Barcelona venue.
Nueva RomaredaZaragozaSpainNot finalNew buildReplacing the existing La Romareda. Does not yet exist.
Estadio de Gran CanariaLas PalmasSpain44,500 plannedAt riskConstruction tender failed in July 2026. Timeline unresolved.
Nou MestallaValenciaSpain70,044 plannedRenovatingLong-stalled build restarted. Guide not yet published.
Estadio RiazorA CorunaSpainNot finalAt riskNamed in reporting as a candidate for exclusion if venue numbers are cut.
Estadio La RosaledaMalagaSpainn/aWithdrawnMalaga withdrew in July 2025 over redevelopment logistics.
Estadio da LuzLisbonPortugal70,000 plannedConfirmedExpansion of over 5,000 seats announced by Rui Costa, 30 November 2024. Named by the FPF to host a semi-final.
Estadio Jose AlvaladeLisbonPortugal52,095RenovatingFenwick Iribarren phased redevelopment. First phase began after the 2024-25 season.
Estadio do DragaoPortoPortugal50,033ConfirmedOpened November 2003. Operational upgrades only.
Grand Stade Hassan IICasablancaMorocco115,000 plannedNew buildDue for completion in 2028. Largest venue proposed for the tournament and a contender for the final.
Prince Moulay AbdellahRabatMorocco69,500ConfirmedRebuilt ahead of the 2025 Africa Cup of Nations.
Ibn Batouta StadiumTangierMorocco75,500RenovatingExpansion works tied to the AFCON programme.
Grand Stade de MarrakechMarrakechMorocco45,860RenovatingUpgraded for AFCON 2025.
Fez Grand StadiumFezMorocco55,800At riskNamed in reporting as the Moroccan venue most likely to be cut if the total is reduced.
Adrar StadiumAgadirMorocco46,000ConfirmedCompleted 2013, upgraded for AFCON 2025.
Estadio CentenarioMontevideoUruguay63,000 plannedRenovatingHosts the first centenary match. Roof being added over most stands.
Estadio MonumentalBuenos AiresArgentina100,000 plannedRenovatingHosts a centenary match. Expansion planned from roughly 85,000.
Estadio Osvaldo Dominguez DibbAsuncionParaguay46,000 plannedNew buildHosts a centenary match. Would become the largest ground in Paraguay.
Method

How this table is maintained

Capacity figures are the most frequently mangled numbers in World Cup coverage, because three different values circulate for most grounds: the current all-seater capacity, the capacity after a planned renovation, and a historic figure that no longer applies. Where a stadium is being rebuilt we label the figure as planned. Where sources disagree we prefer the club or federation's own published number over aggregated listings.

Two specific cautions worth stating plainly. First, planned capacities are not commitments; several are attached to projects without confirmed funding or timelines. Second, figures announced by candidates for club office are proposals, not policy. A figure of 83,000 for Estadio da Luz circulated widely in late 2025 having come from a Benfica presidential candidate who subsequently lost the election. The figure carried by the club's actual leadership is 70,000.

What we do not know yet

The final venue is unannounced. The total number of host stadiums is unsettled, with reporting suggesting a cut from twenty to as few as seventeen across Spain, Portugal and Morocco. No ticket sale dates or prices have been published. Match allocations per venue have not been made. None of these gaps are filled anywhere on this site with an estimate presented as fact.

Change Log

Every correction, in public

When a figure on this site changes, the change is recorded here with the date and the reason. Entries are added, never edited away.

17 August 2026

Tracker published. Initial status assigned to all twenty-three proposed venues from primary club, federation and architect sources plus contemporaneous reporting.

17 August 2026

Estadio da Luz capacity recorded as 70,000 planned, not 83,000. The higher figure originated with a candidate in the November 2025 Benfica presidential election who was not elected, and does not represent club policy.